Are you developing any Test Plan or Test Strategy for your project? Have you addressed all the risks properly in your Test Plan or Test Strategy?
As testing is the last part of the project, it’s always under pressure and time constraint. To save time and money you should be able to prioritize your testing work.
How will you prioritize testing work? For this, you should be able to judge more important and less important testing work. How will you decide which work is more or less important? Here comes the need for Risk-Based Testing.
Table of Contents:
Risk in Software Engineering
What is a Risk
Risk is the anticipation of loss, a potential problem that may or may not materialize in the future. It is usually the result of the lack of proper information, control, or time. In other words, the risk is a problematic situation, which has not yet occurred, that might cause some loss or derail the progress of the project if it occurs.
Software risk(s) that exist in the future (e.g. market needs, technology changes) is quite uncertain. Numerous known and unknown factors cannot be integrated with the software project plan.
Risk identification, assessment, and management are the main elements of every software project. Effective analysis of software risks will help in reducing the chances of these risks turning into issues.
Risks are identified, classified, and managed before the actual execution of the program. The following section discusses software project risks and mitigation examples.
Risk Scenarios
Software project risks can occur from the following possible scenarios:
- Unknown Unknowns: These are mainly technology-related risks of which the software organization is completely unaware. For example, working with unknown tools (no experience with these tools) or technology poses a risk.
- Known Unknowns: Although the organization is aware of these kinds of risks, they are unsure whether such risks exist in their software project. For example, miscommunication between the client/stakeholder (and product owner) and the development team can cause gathering incorrect requirements. Although this is a well-known fact, the team is unsure whether the client provided accurate information.
- Known Knowns: These kinds of risks are very well known to the project team and are based on facts or historical evidence. Identification of these risks is done early and comprehensively documented in the project plan. For example, an inadequate number of resources or lack of skill may cause a risk in delaying the development of the software application.
Types of Software Risks
#1) Schedule Risk
The possibility of a plan, strategy, project, activity, or task taking longer than expected is referred to as schedule risk. The schedule usually contains estimations (which are forward-looking) that are quite uncertain. As a result, there is a risk that the estimated time durations, dependencies, and assumptions considered in the schedule may prove incorrect.
This refers to the risks associated with project delivery planning or timing. These risks mostly arise when projects run behind schedule, causing development to stall and negatively affecting software project delivery. If scheduling risks are not addressed in time, the project may fail. This will reduce the organization’s ROI.
Project schedules slip when project tasks and schedule release risks are not addressed properly. Schedule risks mainly affect a project and, finally, the company’s economy. This may lead to project failure.
Reasons that could contribute to the schedule slippage:
- Inaccurate time estimations.
- Resources (people, systems, etc.) and skills of individuals are not optimally used.
- Failure to identify complex functionalities and time required to develop those functionalities.
- Unexpected project requirement changes or late changes in requirements.
- Lack of software development and engineering processes.
- Lack of sufficient QA.
- Communication issues.
- Not using the right tools.
How to avoid or minimize schedule risk?
- Include stakeholders and management in the estimation process.
- Anticipate team members leaving and new hires. Reserve time and cost for this.
- Reach a complete consensus on the product’s core and optional features.
- Implement essential engineering and QA processes.
#2) Budget Risk
Budget risk is a very dangerous risk. It relates to the monetary risks mainly caused by budget overruns. The financial side of the project should always be managed in accordance with the project plan.
However, when the financial aspect is mismanaged, budget concerns occur, resulting in budget risk. Therefore, efficient budget allocation and management are required for the success of any project.
Budget risk can arise because of the following reasons:
- Improper initial budget estimation and allocation.
- Unanticipated project scope expansion (requirement changes).
- Cost overruns
- Mishandling and inaccurate tracking of the budget (budget mismanagement).
How to avoid or minimize budget risk?
- Decide on the project scope/requirement after doing thorough research, before the initial cost estimation.
- Regularly track the budget to maintain constant control.
- Anticipate any changes/updates and calculate the costs accordingly.
#3) Operational Risks
Operational (also referred to as procedural) risks are the risks that might occur in day-to-day operations during the project development phase. These risks happen because of inadequate process implementation or some external environmental factors and actions.
Operational risks can arise due to some of the following reasons:
- Mismanagement of the project tasks.
- Conflicts within the team.
- Failure to prioritize tasks.
- Roles and responsibilities are not precisely defined.
- Lack of skilled resources.
- Inadequate training in the application and/or technology.
- No resource planning (insufficient resources).
- Lack of communication or miscommunication within the team.
- Poor project management.
How to avoid or minimize operational risks?
- Use agile methodology (e.g. Scrum).
- Hire the right number of resources with the required skills
- Prioritize tasks (maybe use some prioritization techniques like MoSCoW prioritization)
- Monitor the task/project progress, inspect, and adapt.
#4) Technical Risks
Technical risks relate to the functional or performance risks which are mainly associated with the working functionality of the product or the performance aspect of the application.
Technical risks can arise because of the following reasons:
- Frequently changing requirements.
- Insufficient knowledge and experience of rapidly changing technologies.
- Implementation is highly complex.
- Module integration issues (improper integration).
- Lack of sufficient amount of skilled resources.
How to avoid or minimize technical risks?
- Hire the right number of resources with the required skills.
- Keep the implementation as simple as possible and consider adequate performance testing.
- Avoid scope creep by proper prioritization of features (or user stories).
- Start with the development of MVP (Minimum Viable Product) and get feedback.
#5) Programmatic Risks
Programmatic risks refer to risks that are usually unavoidable. These are the external and uncertain risks that are beyond the control of the software programs.
We list below some events that can lead to programmatic risks:
- Running out of funds (limited budget allocation for the project).
- Rapidly changing market needs or no market development.
- Sudden changes in government rules and regulations (e.g. GDPR).
- Changing customer product strategy and priorities.
- Contract cancellation due to issues with client organization (e.g. budget cut, internal politics).
How to avoid or minimize programmatic risks?
- Hire experienced business analysts and empower them to do thorough market research.
- As far as possible, make proper budget estimation by considering changes and/or updates.
- Implement Scrum framework so that changes in customer requirements can be accommodated efficiently and with more ease.
Risk Management
Software risk management consists of two distinct activities: Risk Assessment, and Risk Control.
Risk management in software engineering has to have an effective and successful strategy that will help protect the organization’s resources, people, profits, brand, and, of course, reputation.
The risk management strategy should address both the internal and external environments. We can develop an efficient strategy to avoid, control, and overcome potential risks.
[image source]
When adopting a risk management plan for any software project, the following seven essential risk management principles need to be considered:
- Identify Risks at an Early Stage: Risk identification should always begin at an early stage in the software project when there is a lot of uncertainty and the greatest possible risk exposure. The project manager, along with the team, should determine the cause of the potential risk and develop efficient mitigation and response actions.
- Overall Goals and Objectives of the Organization: Make sure that the risk management strategy aligns with the overall culture, goals, and objectives of the organization. Each organization will have different desired goals and priorities, which should be considered when developing a risk management plan.
- Context (Perspective): Organizational context is very crucial when dealing with software project risks. Various environmental elements (societal, political, geographical, technological, and legal) influence and affect every organization to varied intensities. Internal culture, communication protocols & channels, and risk management processes vary considerably from organization to organization. It is therefore crucial to consider both the internal and external contexts while defining risk management strategy.
- Stakeholder Involvement: All the stakeholders should be involved at each decision-making stage throughout the risk management process. The roles and responsibilities of all those involved should be very clear and well-defined.
- Clear Roles & Responsibilities: Ensure that each one involved is well aware of the roles and responsibilities at every stage of the software risk management process. The risk management process must be open (inclusive) and transparent.
- Risk Evaluation at each step: Once the risk management plan is in place, evaluate risk at every step and execute reasonable preventive actions. Implement inspect and adapt cycles.
- Review & Improve: Review the risk management plan & strategy after the completion of the project to assess how well the plan performed and check if there is any scope for further improvement.
Risk Assessment
In this fast-paced and rapidly changing environment, technologies, and of course, ever-changing unique requirements, vulnerabilities of the software applications are also strengthening. As a result, the risk of the software systems failing is ever-increasing.
Software risk assessment is the process of identifying, analyzing, and prioritizing risks at the earliest stage and saving time and money.
It is a critical step in getting prepared for any potential future problems that might occur in the software project. If a potential risk is identified during the risk assessment, a possible viable solution or action plan (contingency & mitigation) should be developed in time.
Performing risk assessment involves three different steps:
- Risk Identification
- Risk Analysis
- Risk Prioritization
Risk Identification: It is vital to anticipate and detect the risks and their types in the software project as early as possible and address them so that possible impact can be reduced by ensuring effective risk management.
The different risks that a software project may encounter are listed below:
- Organizational Risks: These risks are related to organizational factors, such as environment, culture, way of funding, etc.
- People (Human Resource) Risks: These risks are related to the people in the development team. The risks can arise because of the error(s) which might be committed (of course unintentional) by the development team.
- Technology Risks: These are the risks that can be encountered due to the hardware and software technologies used to develop the software system.
- Tools & External Libraries Risks: These risks are related to the tools (e.g. IDEs used for development) and other third-party software/libraries.
- Estimation Risks: These risks are related to incorrect estimations of cost, time, and resources.
- Requirement Risks: These risks can arise from the ever-changing customer requirements and managing those changes.
- Market Risks: These risks are related to the volatile market needs and the often changing rules & regulations.
Risk Analysis: In this phase of risk management, analysis is done on the likelihood of occurrence of every identified risk and its severity in terms of its effects. Risk analysis is performed based on experience (experience gained from previous projects, by the developers).
Risk Prioritization: In this phase, the project management team estimates the probability of the occurrence of every identified risk. Also, the seriousness of the risk is gauged.
Each risk is assigned to one of several bands of probability, as it is not possible to establish an exact numerical estimate of the likelihood and severity of each risk.
- Bands of the probability of occurrence (Likelihood): Different bands of the probability of the risk are defined as very low (0-10%), low (+10-25%), moderate (+25-50%), high (+50-75%), and very high (+75%)
- We can categorize the severity of the risk as:
- Catastrophic: This risk severity threatens the overall survival of the project.
- Serious (Critical): Significant delays in the project delivery will occur.
- Tolerable (Moderate): Delays caused are well within the allowed contingency.
- Insignificant (Negligible): Risk can be ignored.
The priority of the risk can be determined by using the following formula:
p = r * s
Where p stands for priority;
r stands for the probability of the risk occurring (true or false)
s stands for the risk severity
Software Risk Assessment Templates
Risk Assessment Matrix Template
The risk matrix is a project management template in the grid format that is used to plot the risk against the likelihood of its occurrence and the severity of the impact on the project.
The top of the grid represents the likelihood of the risk happening, from very likely to highly unlikely. The left side represents the severity of the risk, from catastrophic to negligible. This risk matrix gives a better understanding of how much attention the risk should receive.
Download the Risk Assessment Template by SoftwareTestingHelp
Risk Assessment Template – by ProjectManager
ProjectManager’s IT Risk assessment template helps in identifying:
- The number of resources (system & personnel) required to continue operating.
- Response time for restoring data or functionality of the application.
Download the Risk Assessment template by ProjectManager
Risk Control
Risk control is the process of managing classified risks to obtain desired results. After conducting a risk assessment of the identified risks, the project manager develops risk-control strategies. It is important to note that different risks need different control methods.
Risk control goes through three steps:
#1) Risk Management Planning: One of the following three main strategies can be used for risk management planning:
- Reduce the Risk: This strategy of planning involves a plan to reduce the loss caused due to the risk. For example, planning to hire new resources to replace the people serving the notice period.
- Transfer the Risk: This strategy involves outsourcing the development of a challenging project or getting a third party to solve a difficult problem that is posing a risk. Another example could be, buying insurance to negate natural disasters, etc.
- Avoid the Risk: Avoid the risk method involves various strategies like paying incentives to skilled, hard-working people; requesting clients to reduce the scope by changing requirements.
#2) Risk Monitoring: Risk monitoring is the process of tracking the risks of different types and evaluating the effectiveness of the strategies/responses which are implemented by the organization.
Once the risk monitoring process is completed, its findings can determine whether proper methods were used, and if new risks can be identified easily. The findings will also help in defining new strategies to replace ineffective ones.
#3) Risk Resolution: Risk resolution is the process of eliminating the risk entirely. It involves finding effective solutions to the risks that occur. It includes techniques like prototype simulation, benchmarking, cost-to-design approach, and so on.
Software Development Risks
In software development, there are several internal and external risks. Here are the risks specifically associated with software development, as well as mitigation actions:
#1) Code Problems: Because of hurriedly developed code and several other reasons, like frequent requirement changes and lack of skills, software applications/projects may contain poor-quality code, which is a very significant risk. Code issues may involve logical errors, complexity, performance issues, difficulty in scalability, etc.
Mitigation:
- Involve proper and sufficient unit testing.
- Conduct code reviews.
- Resolve observed bugs/errors on time.
- Maintain defined coding standards.
#2) Budget Issues: Budget (cost) issues are another risk involved in software development. It is important to continuously monitor projects so that they don’t overrun the budget estimates, which can happen because of often changing requirements.
Mitigation:
- Update the project plan and budget whenever requirement changes are committed.
- Maintain continuous customer/stakeholder collaboration.
#3) Scope Creep: Continuous and uncontrolled changes to project scope and/or requirements can lead to project delivery issues.
Mitigation:
- Changes to the project scope/requirements should follow a systematic process. The development team should be taken into confidence, allowing them to provide feedback about the changes. The process should be collaborative.
- Features/User Stories should be properly prioritized so that the development team can decide what is possible and what is not possible.
#4) Productivity Issues (Low Productivity): Software development teams might have productivity issues and struggle with the project work because of delays, employee fatigue, and several other reasons like internal conflicts, insufficient training, etc. This can be a serious risk to the overall project.
Mitigation:
- Communicate (internal & external communication) effectively about project work details and any problems. Maintain transparency and foster teamwork.
- Set SMART (Specific, Measurable, Attainable, Realistic, Timely) goals for the team members.
- Emphasize task (or user story) prioritization and Sprint planning (make a strong project plan with a well-paced timeline).
- Appoint a leader (Scrum Master/PM) who can manage the team by motivating and guiding.
#5) Tight & Aggressive Deadlines: Having a tight & impractical delivery deadline might put extra pressure on the development team members. The team may not meet such deadlines, which might pose a substantial risk in the long run.
Mitigation:
- Set realistic timelines by creating a thorough project plan.
- Implement Scrum framework.
#6) Improper Risk Management: Adequate risk management is required for software development teams to identify issues and respond to them effectively. Otherwise, poor software risk management can be a major risk in itself.
Mitigation:
- Include risk in estimations.
- Make use of the risk register in estimations and in the product backlog.
- Identify potential risks.
- Analyze and calculate the likelihood of identified risks.
- Prepare a thorough mitigation plan.
- Continuously monitor the risks.
#7) Poor Project Management: A project’s success depends on effective project management since it may produce goals, expectations, timelines, and deadlines that are all well-defined. So, if the project is poorly managed, there might be a very serious risk.
Mitigation:
- Make use of efficient project management software tools.
- Recruit an experienced project manager (Scrum master for Scrum).
- Create a thorough project plan.
- Keep the communication lines (internal and external) simple and clear.
#8) Stakeholder Problems: Low stakeholder engagement and especially when the stakeholders are from the client side, can be a major risk. Slow responses from the customer can become an impediment to software delivery.
While working with Scrum, stakeholder engagement is actually increased. Product increments are more frequently delivered and require continuous feedback from client stakeholders to the development teams.
Mitigation:
- Communicate and collaborate with customers/stakeholders frequently.
- Create a thorough project plan so that expectations from the project are clear to the stakeholders.
- Clear project goals.
- Clear work agreement with customers/stakeholders about the response time (for feedback/questions).
- Implement Scrum framework.
#9) Unfulfilled Expectations/Inaccurate Estimations: Project estimations sometimes create expectations that can’t be met. Inaccurate estimations can be caused by various reasons like underestimating task/user stories.
Inaccurate estimations of timelines, costs, and resources can lead to unmet expectations of the customer. This is one of the very likely expected software project risks.
Mitigation:
- Prioritize tasks/user stories properly.
- Consider uncertainties and risks in the estimations.
- Consider spikes and ad-hoc tasks in estimation.
#10) End-user Engagement (User Response): The success of a project is directly proportional to the number of users that purchase and utilize the product, so user response is critical to the project and business. Poor user response is another software development risk.
Mitigation:
- Consider Beta testing and user testing.
- Send out surveys to the end users.
- Implement agile and do frequent releases.
- Create focus groups to collect information.
#11) Attrition (Team Members Leaving): Attrition is another significant risk in software development and the project. When project team members leave, it is often hard to replace their experience of the application, their unique skills, and specific expertise.
Mitigation:
- Request leaving team members to create a thorough knowledge transition plan.
- Document important project details.
- Design sufficient training programs for the new team members.
#12) External Environmental Risks: Unpredictable external factors like changes in government rules & regulations, market changes, and natural disasters may form external risks. Although it’s difficult to avoid external risks, there are possible mitigation actions to lessen the impact.
Mitigation:
- Obtain insurance (in case of natural disasters).
- Stay well informed about changes in government rules & regulations.
- Stay informed about current market events.
- Respond as quickly as possible to any external risks as they happen.
Software Testing Risks
Similar to the risks in the software development testing phase/cycle may face some risks (which we will discuss in detail in another article). It is crucial to identify and manage software testing risks.
Some risks which might occur:
- Test environment availability issues.
- Delays (excessive) in resolving bugs found in testing.
- Lack of adequate domain knowledge and testing skills.
Also, read => Risk-based Testing – Ultimate Guide
Software risk analysis tools:
Software risk analysis tools can assist the project team to identify and mitigate potential risks, making life a little easier. Commonly used tools are listed below:
- EcoOnline
- LogicManager
- EHSInsight
Suggested Read => Top 10 Risk Assessment and Management Tools
Conclusion
Identifying the risks at the right time and having proper plans to mitigate those risks is vital for any software project to succeed. The above article discusses the types of software project risks and risk management.
Hope that you had a good understanding of the risks in Software Engineering.
Please share your thoughts in the comments section below!












Hi,
Is these risks taken care by testers.What are responsibilities if we found such type of risks.Mainly Operational risks.
pliz help me;am working on a project tha should be related to IT.my choice is to createv a system for a library.pli give me a sample of a library system project.
This is quiet an interesting site i can say. i would love to know how risk management plans are to be gone about as far as project planning is concerned.
I am working as a Soft Ware Test Engineer .Anybody can tell How to prepare Test plan
Since you mention your next article, it would help to have a link to that article. I don’t see one anywhere obvious.
i need help! have a report on the misinterpretation of risk management in software project management….could u give me some links where i could source of materials to help me. i need every advice or material
I am a IADCS student, and I want to know about the risks faced by project manager. Please explain me about the summary of risks faced by project manager taking over an existing project, which has a cirtical deadline
Hi , I’m currently doing my master’s thesis on risk based testing . I was wondering if anybody in this group has anything to say about “Risk Based Test Prioritization in Agile processes” .. I haven’t personally worked in an agile environment , so , do you think if risk based priotization of testcases in an agile process maes any sense at all? or are is it a contradiction of terms
my e-mail address: vercic@gmail.com
How to handle and mitigate these technical risks and Programmatic Risks? i am not finding contusion link.
if any where i am missing plz mail me
Hello,
looking for a change with following profile
Exp – 5 Years
Skill- Manual testing, sql, Unix, agile, knowledge of QTP
Notice- 15 days
Location- Pune
email- aishwarya.koche@gmail.com
Thanks in advance
I need different types of test cases writing.
for Eg: for login screen wht are the types or in what all ways we can write.
@Vijay
I agree what you stated is right. QA is nothing but Planned and systematic set of activities. Before risk occurs we need to state that what are the possible ways it may occur and also the preventive action plan.
@Priya.K (Login Screen)
1. As of Unit Testing – Validation of Username and Password
2. Integration – On click of Login whether server validates the authenticated user or not
3. System – Recovery Testing, Performance Testing, Regression, Security Testing, Compatability Testing (OS and Browsers).
Clasify them from the start as project or product risk. It will help a lot.
Frankly I’m a little saddened by the blasé nature of the attitiude towards testing as a profession on here.
I’ve been a professional test consultant to some of the UK’s and the world’s largest IT programmes over the last 15 years and would say that the information being disseminated BY POSTERS on here is largely innaccurate and misleading to those wishing to start a career in testing.
If you have any sense at all you’ll already know that taking you knowledge from others on internet forums is definitely no way to learn in the long run. Read, pay to study for an ISQTB or similar, most of all, go out and get a role with a group of test professionals who will pay very little but give you great experience on projects.
Don’t waste your time trying to cut corners by getting ‘tips’ in forums, trust me, though the information presented by the website is GOOD, the information given by other posters is weak at best.
So I repeat, and I’m sure the site owner would agree, there’s no substitute for real experience and proper study, but sites like this can be an excellent supplement and a great help whilst you’re working (I came here to read a little regarding representation of risk in test planning and got distracted by the terrible posts of some people).
Good luck all
hi ,
i want to know the answer of a question asked in inteview.
Hi Vanitha,
Testing methods are common for every tool if you have domain knoledge means enough.
now a days in market having SAP testing,.net testing and Mainframe Testing etc..but the testing methodologies are common in software testing what ever the application is your going to apply common proceedure so dont bother about it you concentrate on concepts of testing and in which time we are going to appy these tests in application.
And the HR asking you why you choose testing ?
comparing to my Engineering degree and skills it is suitable to me and i have such politeness to work on it.
I am attending interviews to get job as software tester. For short duration projects companies expect me to have full knowledge of TEST PLAN,TEST METHODOLGY , TEST STARTEGY and TEST DELIVERABLE.Many times i face problem to answer these questions properly.Can anybody tell me how to prepare test plan. Please help me with these questions.
@Vami – Problem is different than risk. Risks are future uncertain events those may or may not occur. Problems are events that are actually occurred.
Handling the resource risks is fairly depend on management. Project management should have contingency plan if any human resource is not available in between the project. Such contingency plan include backup resources, training approach to new resources. Also fair work distribution and involvement of each project member in every project activity can minimize resource risks.
@ Hari and Mruga- Ideally each and every risk should be identified in advance and contingency plan should be available in project risk management strategy. Individuals may be testers related to each risks are responsible for implementation of risk response action based on risk occurrence.
@Rahul – Risks related to coding are Technical risks and not come under Programmatic Risks.
Guys, in coming post I will cover risk identification, Analysis and management in detail. So all your queries will get addressed in detail.
hi,
thanks for dat
I am working as a Soft Ware Test Engineer.Anybody can tell how to prepare Test Plan
hae.
1 luv.. tnxs alot..
Should we consider and risks as problems while analsing risks?
More on how to address the risks associsted with resources, mainly human resources like if a tester is leaving the team in between then how to analyse the effect of this on project performance and how to minimise such risks?
could u tel me the how to design and write the testcases.
According to adhoc testing, when we test without specifications, if any changes occurs in ur build… whether this test case should be added in the specification or not…
Can u reply this question…
Hi ,
I want the information on how to identify risks when our tool is replaced with third paty tool.
How to identify risks when the third party product is interacting with so many interfaces( we dont ahev any documents like BRS.Only when we have arche tech diagrams and small description abotu the interfaces and product)
I am looking for a job in Software Testing.plz help me in if anyone has vacancy in their company.
Hi,
I have a question that how the testers can incorporate these risks in their testing cycle?Is this only be used at the time of creting Test Plan?
Hi,
Can you elaborate on Programmatic Risks,
Does it depends on the coding? you have not mentioned anything about coding…..
please explain to me types of maintainance that can be carried out on a software product?
Does anybody know what Risk aging is and how do we monitor it ?
Hai Everybody…i am silent member to this community….i am a entry level testing professional ….can anyone suggest good testing books for basic software testing ?
plz anybody send me manual testcase documents.
what is the difference between version and Build?
can some body please give the best bug report formart..
or else give some tips to prepare a effective bug report.
regards
gayatri
What are the Common risks and assumptions deck for Mainframe testing?
thanku.
hi vijay or anyone can you mail me the “How to identify and manage risks” material to lalitd@indiatimes.com its urgent
any reference or citation of research paper, journal or book about this data ???
Risk is nothing but minimizing of the budget to test without compromising on losing the biz due to missed defects.
In more simple terms if you take it,
suppose you have to test an application, and you can do 100% Test coverage and it takes suppose 25 man days,
Now do some analysis,
First : if you reduce the man days available to 22 and check for the coverage how much you can target, whihc in some statistical analysis comes to 90.3%
Second : if you reduce the man days available to 20 and check for the coverage how much you can target, whihc in some statistical analysis comes to 90.2%
Third : if you reduce the man days available to 18 and check for the coverage how much you can target, whihc in some statistical analysis comes to 90.1%
Fourth : if you reduce the man days available to 16 and check for the coverage how much you can target, whihc in some statistical analysis comes to 85.1%
then it is obvious that bringing the testing time to 18 days gives a test coverage to 90.1 % but any further reduction results some drastic change, however with 22 man days of effort it is not making much of a variation from teh one at 18.
Hence proceed with 18 man days .
But there are some tools which big organisation develop for their projects and proceed with a Risk Based Testing, which is more statistical to help the client be in synch with what is the risk.
Pooja – Send me yr CV, my company is looking for software testers, we are a MNC company based in cyberjaya, malaysia
i want learn s/w testing tool…but i don,t have any idea about this…..if i learn with in 30day…r not?..it easy r not?if i learn this i’ll get a job easly?
Hi…
please tell me which test shold be efficient if code below ten thousand line?
about insurance
You mention the ‘next article’ How to identify and manage risks- where can I find it?
HI,
Could please let me what kind of Risks/Contingencies are expected to be written in a test plan.
i am a student from informatics computer school running my Bsc in computing. as part of my assignment i was assigned to identify 10 possible risks that can occur in an examination system for a school. and i have no idea how to identify these risks. can someone pls help me..thanks.
what is the main difference between qa and qc?
Gone are those days, where QA sit in a corner and find faults and just log it manually with the products or application. no one needs those testers now, own the application, fix the issue and take pride. no shortcuts, work hard
I need an best IT explainer I m ready to pay an amount…..
Hi..
Am testing a web application.in tat application OS has been upgraded.I need a sample TEST STRATEGY and TEST PLAN for OS upgrade.kindly send me these 2 docs to my mail performanz87@yahoo.com
Thanks for data…
How to begin in an interview wen a question is posed explain ur current project?wat n all things to b covered while answerin for this wat not to mention to play safer
Can u please send me sample document s of test plan to this mail id rchandra06@gmail.com
Hi Veronica
Please find the answer for your query :
Veronica on 12.19.07 at 8:06 am
When you say you need to know Testing Process..
i would like to know where you want to pitch in ..
1)Test Requirement Analysis
2)Test Scenario specification
3)Test case/Script preparations
4)Test Execution
5)Test Reporting
6)Test Report Analysis & Review
Hi
I am Sr. Software engineer with an experince of 8 years in manual testign and in Managing projects (As acting team lead). could any one mail me the type questions that can be asked to an 8 yrs experinced tester.
Thanks in advance
Regards
Ritika
can you anybody tell me what testing we are use in software projects commonly. how to find the differences .
thanking you
thank a lot Tiger
how to evaluate the potential risk and to justify plan for risk management in deployement and implementation of software
@vinodini,
i will one u one ex for this.
assume there r 3 modules ‘A’,’B’,and ‘C’ and 3 Test Engineers 1, 2, 3.
1. Assumption: every person who all involved in project will remain till the end of product life cycle.
2. Risk: some person may quit the job in the middle, who has been assigned to handle module ‘B’.
3. contingency plan :
person1 : primary module -> ‘A’
secondary module ->’B’
person2 : primary module -> ‘B’
secondary module ->’C’
person3 : primary module -> ‘C’
secondary module ->’A’
so in this ex, person2 has left job, so person1 has to continue with this module. so v can save time of training new engineer.
suggestions would be accepted.
thanx,
Hi,
I need to create a Risk Management Plan, I came upon your site while searching the net for some references. Do you mind if I use this a reference? I would like to request for your permission so I could include the information here to my document.
Thanks,
Roel
Hi
How to handle and mitigate these technical risks and Programmatic Risks? i am not finding contusion link.
if any where i am missing plz mail me.
The test strategy is provides the steps tobe taken under while testing and the efforts, time and
resourcess required for the testing. am i rite.
I am working as Software Test Engg. Till now I have not appeared for any of the Testing certification Exam. So can you please suggest me for which exam Should I appear first…..?
hi can you please send the testing premier book to srinivaspatro@gmail.com? i tried to download from the given link, but its not working.
i am dilwar.i am in BCA 2nd year students. i have a problam bt i can’t understands how is it comeplite.i will trying to many times of this question but can’t proparly solve it plz somebody person i request u solve this question and send to me
if a sotwere had failures in 100 tests during 10 day of testing what would be a good estimate of the realiabillity of the softwere over the next day?week?
hi first of all you should write the fields like testid,test description,test steps,expected result and actual result,test status for further contact my gmail jobssalim@gmail.com
Hi,
I need to know RMMM. How can I reference any RMMM plan for a particular list of risks. Can you send me few links related to finding Risk Mitigation, Monitoring and Management Plan asap?
@manya –Hi agile testing is development driven by testing … Risk based prioritization would be for any testing process and it will also be in agile testing
BUID is process of converting sourece code in to executable code (.exe) and giving it to the testers for testing.
Version is number of release made during the life cycle of a product.
hai
can u give some information about test data and how to generate test data
HI
I am ramani chandra
Last week I attended tcs interview.They asked one question about severity and priority.question is if i am having the bug wiht low priority and high severity which one will i test first? I said high severity i ll test first is it correct? this is my email id :rchandra06@gmail.com
please send me some real time interview questions and how to answer
Hi Ramani ,
Please find the answer for
Query: 49 Ramani chandra on 09.17.10 at 10:25 am
for me it seems, we should test High priority and low severity bug if there is strict time line.(Delivery time is very near and you cannot focus on Major bug fixes)
Justifications :
# We can easily make the fixed code on board with minimal time .
#most probably , the test effort and bug fix effort will be less for low severity bug. for example : A spelling mistake on the home page .Developer can easily fix the issue and deploy the bug fixed code on board with in minimal time.
#If developer tries to fix the high severity issue , QA needs to do a regression test to ensure previously working functionalities are not breaking.
Please let me know other’s comments/ thoughts .
Hi Vinodini,
This is Suresh Working as a Test Engineer. I have mentioned about Risk and Contingency as follows:
Risks and Contingencies
Specify any potential risks and plans for mitigating, addressing and/or resolving those risks.
Thanks,
Suresh
bsuresh7282@gmail.com
Hey,
when you say next article, please add a link to that location so that we can access it.
Thanks
Hi, my name’s Veronica.I’m beginner in the knowledge of software testing. May I talk with someone, who can help me understand this process. My english is not so good, but I undestand what you’ll can to say. I read many information about sofware testing, but I nor undestand the essential of this. May I talk with somebody by ICQ who know how it work, who can give me the sample which I try to do the test. In theory I undestand , but in practical I’m zero.
Please help me somebody!
Send your IQ address on my e-mail.
Thanck you very much.
explain a risk factor with a practical example in daytoday life…………………….
I want to know the terms 1. Test Strategy,Test case,Use case,Test plan,Test Suite?
Hi
I am Sr. Software engineer with an experince of 8 years in manual testign and in Managing projects (As acting team lead). could any one mail me the type questions that can be asked to an 8 yrs experinced tester.
My email id is : ritika102011@gmail.com
Thanks in advance.
Regards
Ritika
hi
I need help about this,I wanna know about generic risk in ITs projects plaese mail me about it.
thanks
sahere_mania2004@yahoo.com
Hi…
which software model can be used if we have limited number of requirements?
hi
can u tell me how to write test strategy?
this site is very best for software project mangment
hi anusha
Testing is easy when u like to do.
1. u should be done BSC or BE or MSC IT or MCA, then it is easy to understand the tool
2. manual testing is easy to learn no programming skill required
3. for automation u should know vb or c# pgm languages
u can learn with in 30 days manual testing
if u want any help regarding books or tool free feel to contact me
manjurock.n@gmail.com
Hi, does anyone know what are the risks for property rental ?
I had dropped a mail to chandra..regd severity and priority justfication..u can check and reply me the comments..
Best Regards,
vamsi Krishna
please talk to me shall guide for better option
8875024797
greeting
i’d like to know if any one have a general risk list for the IT projects.
thanks
i appreciate ur stand as in helping us.but i need to understand more about risks under project recruitment
Build means which is released to testing team for testing.
whereas version means which is released to end users for use or may be for acceptance testing.
correct me if am wrong.
I am a fresher I am going to complete my diploma in IT
in feb month .I have good knowledge of manual testing as well as automated testing such as winrunner,testdirector.load runner and QTP.i have worked in live project. so Ple advice me how to get into company as fresher my Ph no is 9902280190 .
Hi
I am Vanitha
I have done B.E(ISE) passed out in 2009. Now i am working in small company handling CRM project(sending sms to customer) . I am working as sofware developer. Actually it is a small company, they dont have any testing tool. so i have coded form. Now i am looking job on software testing.
So How do get prepare???
Which Testing Method is good for CRM??
If HR Asks me….. why i am looking job in software testing field..
Then How do i Convice him???
Please help me……